Roasting and leaching for telluride gold ores
Telluride-bearing gold ore has shaped Australian mining history, most famously around Kalgoorlie-Boulder in Western Australia. At suitable grades, a roasting and leaching process flowsheet can release valuable metal locked in gold tellurides and associated sulphides, but the route depends on how gold, silver, tellurium, sulphur and arsenic occur in the rock.
Modern project decisions are rarely based on a textbook route alone. A useful flowsheet links representative sampling, comminution, concentrate production, oxidative roasting, calcine preparation, leaching and gold recovery while identifying the waste streams created at each stage. That integrated view matters because a technically successful leach can still fail on reagent consumption, energy use or tailings chemistry.
Gold tellurides such as calaverite commonly accompany pyrite and other sulphides. Fine grinding may liberate some valuable particles for gravity or flotation recovery, while the refractory remainder needs oxidation before cyanidation. Lower-grade or complex deposits may fare better with bulk treatment and an alternative oxidation route.
For Australian owners, the case is operational as well as metallurgical. Water availability, FIFO rosters, regulatory approvals and relationships with Traditional Owners shape the project alongside the reactor design. A roasting and leaching flowsheet should therefore be developed as an operating system, not an isolated sequence of equipment.
Characterisation before process selection
Begin with a sampling plan that represents both the orebody and the proposed plant feed. Composite drill samples should be split for gold and tellurium assays, mineralogical examination and diagnostic roast-leach tests. Fire assays remain central to gold accounting, while quantitative mineralogy can show whether gold occurs in tellurides, sulphides, quartz or clay.
The key question is whether fine grinding and pre-concentration can recover a saleable or treatable fraction before oxidation. Gravity separation can capture coarse, liberated gold, while flotation may concentrate telluride-bearing material. Bulk treatment remains an option when concentrate recovery would be too low or the resulting concentrate would create an undesirable roasting feed.
Pilot work should compare roasting with pressure oxidation or bio-oxidation followed by leaching. Each route has a different oxygen demand, capital requirement and residue profile, so the preferred option should follow test results rather than precedent. Australian-dollar revenue forecasts, reagent freight and the potential value of recovered tellurium belong in the same comparison.
Comminution and pre-concentration
Crushing should open the ore without generating an excessive fines burden, and grinding should expose the mineral phases targeted for recovery. A closed-circuit SAG and ball mill configuration is common in Australian gold plants, with the final grind size selected from liberation, flotation and leach-response tests. Excessive grinding before flotation can increase oxidation and complicate concentrate handling.
Flotation is valuable when tellurides can be separated from gangue, although their response can differ from ordinary sulphides. Reagent staging, pulp density and particle size need systematic testing, and recovered concentrate should be checked for arsenic and other elements that could complicate roasting. Useful diagnostic work includes flotation air dispersion analysis, because bubble size and dispersion can explain a disappointing separation that otherwise resembles a reagent problem.
A flotation concentrate then reduces the tonnes entering the roaster, lowering fuel demand and gas volume. If recovery is weak, or the gold-bearing fraction is too fine for effective concentration, the plant may need a bulk roast followed by a broader recovery circuit.
Oxidative roasting and gas control
The concentrate is commonly dried, size-controlled and fed to an oxidising roasting system. Inside the furnace, sulphur and telluride-bearing phases convert to oxides, while newly exposed gold surfaces become available to a subsequent leach. Temperature, oxygen concentration, residence time and feed rate are interdependent: insufficient oxidation leaves refractory particles, whereas excessive heat can cause sticking, fusion or tellurium loss.
Gas-solid contact should be uniform across the bed. Operators need reliable feed and temperature measurements, controlled oxygen addition, pressure management and early detection of dust or abnormal combustion. Sulphur dioxide normally requires capture and conversion, while arsenic, selenium and fluorine may need specific controls. The design must accommodate safe isolation, hazardous-area requirements and reliable maintenance access.
The hot calcine leaves the furnace, so cooling and quench design influence downstream grinding and leach chemistry. A regrind stage can improve gold liberation and leach kinetics. Residual solids should be sampled for both gold and tellurium, ensuring that the apparent benefit of roasting is not offset by valuable metal remaining in coarse or poorly oxidised particles.
Leaching and precious-metal recovery
Leach chemistry begins with the calcine, not with a standard recipe. Cyanide leaching under alkaline conditions is a common option, with carbon adsorption used to capture dissolved gold from stronger solutions. Operators must track free and total cyanide, pH, oxygen availability and solution assay, because tellurium-bearing liquors can increase reagent demand or interfere with downstream recovery.
Non-cyanide leaching, pressure-assisted oxidation and other chemistry should be evaluated when reagent handling, water quality or product purity makes cyanidation less attractive. A hybrid flowsheet may also float residual telluride or sulphide after the roast. In that case, pilot testing of air-flow effects on recovery can help establish whether the flotation circuit warrants inclusion.
Pregnant solution then passes through adsorption, stripping and electrowinning, with doré metal sent for refining. Tellurium deportment needs its own balance: it may remain in the residue, enter the leach liquor or report to an off-gas stream. Each route has a different saleability and treatment cost, so recovery of a minor element should not be assumed to be profitable.
Water, residues and Australian requirements
Water is a defining constraint for many Australian gold projects, particularly in the arid goldfields of Western Australia. A plant that appears water-positive on a mass balance can still be constrained by the quality, location and timing of licensed supplies. Tailings supernatant recycle, dust suppression and process segregation should be assessed against bore allocations and the requirements of the Water Act 1914.
Environmental approval commonly involves the Environmental Protection Authority and the Environmental Protection Act 1999, with federal assessment also relevant where a project triggers the Environment Protection and Biodiversity Conservation Act. Permit conditions may govern SO2 emissions, cyanide destruction, arsenic management, groundwater monitoring and closure. These obligations should shape equipment selection rather than arrive during commissioning.
Safe Work Australia guidance and Western Australian mining safety regulations support detailed management of furnace dust, hazardous chemicals, stored energy and oxygen-enriched atmospheres. FIFO rosters add fatigue, travel and handover risks familiar to crews travelling between Perth and remote sites. Emergency response, maintenance access and competency-based training need to reflect actual roaster work.
Traditional Owners are also project stakeholders, not a late administrative item. Early engagement should consider native title determinations, access agreements and any requirement under the Aboriginal Heritage Act 1972. Recording cultural places, agreeing on monitoring and respecting agreed protocols can reduce delays and build the community support needed for reliable operations.
Metallurgical and commissioning checkpoints
The first checklist protects the metallurgical case from assumptions that emerge during scale-up. It should connect laboratory results to the equipment and operating envelope.
- Composite drill samples tied to a geological domaining model, with gold, silver and tellurium assays and mineralogical checks
- A deportment study locating gold in tellurides, sulphides, quartz or clay, including locked and composite particles
- Locked-cycle roast and leach tests measuring gold extraction, cyanide consumption, reagent demand and residue assay
- Mass balances for dry solids, water, oxygen, sulphur and tellurium, with samples from every significant stream
- An economic assessment based on recovery, reagent prices, power, consumables and the value of recoverable tellurium
For the plant itself, the handover checklist should cover scale-up, compliance and reliable operation.
- A scale-up plan from pulp solids and feed rate, including mixing, residence time, gas handling and flotation performance
- Pre-agreed operating envelopes for temperature, oxygen, pH and pulp density, with clear alarm and isolation limits
- Commissioning protocols for metallurgy, instrumentation, electrical integrity, occupational health and environmental compliance
- Operator training covering the process, sampling, isolation procedures, emergency response and local site requirements
- Performance guarantees tied to feed characterisation, assay methods and defined operating conditions, not one laboratory result
Move from test work to an integrated plant
A process concept becomes bankable when engineering, procurement and operating requirements are developed together. Mine design and plant configuration must align with the actual ore variability, while procurement decisions depend on verified test work. Commissioning and operational support should be planned before the first production feed enters the circuit.
Lozova’s processing plant solutions connect equipment selection with ore testing, engineering, procurement, construction and commissioning. This integrated delivery model can be applied to a new telluride gold project or an expansion of an existing operation, including plant management and technical support after handover. Perth’s engineering and laboratory network provides a useful base for projects serving Kalgoorlie-Boulder and remote Australian operations.
Contact Lozova with representative samples, preliminary assay data, planned throughput and the preferred operating model to request an ore-specific test program and an engineering concept for the roasting and leaching circuit.