Blog Contact

Designing A Spiral Testwork Program For Ilmenite Beach Sands

Ilmenite beach sands can contain valuable titanium minerals alongside rutile, zircon, monazite, quartz, garnet, shell fragments, and clay coatings. A spiral concentration study helps determine whether the deposit can be upgraded efficiently before magnetic separation, electrostatic cleaning, or a larger pilot campaign. The work is most useful when it measures both recovery and product quality under conditions that resemble the proposed plant.

For Australian operators, the study must reflect local ore variability, water availability, environmental obligations, logistics, and customer specifications. A flowsheet that performs well on a single composite may behave very differently across a strandline, dune sequence, or dredged feed. Careful sampling and disciplined process control therefore matter as much as the choice of spiral equipment.

Defining The Feed And Mineralogy

The first task is to establish what the spiral will receive. Samples should represent mining blocks, depth intervals, beach ridges, sand dunes, and low-grade zones rather than relying on a conveniently accessible stockpile. Each sample requires records for location, elevation, moisture, particle-size distribution, heavy-mineral content, and visible contamination from clay, shell, or organic matter.

Ilmenite commonly occurs as fine, liberated grains mixed with other heavy minerals. Its specific gravity allows gravity separation from lighter quartz, but the density contrast with rutile, zircon, garnet, and monazite can be less useful for producing a final saleable product. Mineralogical examination using QEMSCAN, MLA, microscopy, or comparable methods can identify locking, alteration, grain shape, and the proportion of slimes likely to interfere with separation.

Australian deposits can show strong regional differences. The Murray Basin in Victoria and New South Wales has different geological and operating conditions from coastal resources near Geraldton or Bunbury in Western Australia. A project team should also account for rehabilitation plans, Native Title consultation, groundwater conditions, and the expectations of state regulators before selecting a representative composite.

For project stakeholders comparing suppliers, Xinhai’s company profile provides useful context on integrated mineral processing equipment, engineering, and plant delivery capabilities.

Building A Reliable Spiral Test

A spiral test programme should begin with desliming and classification tests, because excess material below roughly 20 to 38 micrometres can increase pulp viscosity and reduce the sharpness of separation. The exact cut size depends on the ore, the spiral model, and the target product. Testwork should measure the effect of hydrocyclone or sieve separation rather than assuming that all feed can enter the spiral unchanged.

A practical campaign includes rougher, scavenger, and cleaner stages where justified. The operator should test several feed rates, pulp densities, wash-water rates, splitter positions, and deck configurations. Spiral performance is often sensitive to small changes in operating conditions, so a single setting cannot establish the commercial recovery curve.

Each test should produce weighed products and a complete assay balance. Head samples, concentrate, middlings, and tailings need analysis for TiO₂, total heavy minerals, iron, silica, zircon, rutile, and any penalty elements relevant to the customer. Mass recovery, mineral recovery, grade, and separation efficiency should be calculated on the same basis, with moisture corrections and duplicate assays used to identify errors.

Ambient conditions can influence visual inspection and camera-based monitoring during sampling or pilot operation. A project team using sensors or image review should recognise the effect of ambient light when comparing observations made at a Perth laboratory with those made outdoors at a remote Western Australian site.

Selecting The Spiral Circuit

Spirals are attractive for beach-sand applications because they have modest power demand, high throughput per unit of floor area, and relatively simple mechanical construction. Their performance comes from a combination of gravity, centrifugal force, flowing-film behaviour, and hindered settling. Heavy particles migrate toward the inner region of the channel while lighter particles report toward the outer edge.

The number of starts, trough profile, pitch, wash-water arrangement, and splitter design should match the feed size and separation duty. Rougher spirals are commonly configured for recovery, while cleaner spirals are operated more selectively to improve concentrate grade. A scavenger stage can recover heavy minerals lost from rougher tailings, although excessive recycling may increase circulating load and complicate control.

The study should test whether magnetic separation belongs before or after gravity concentration. Removing strongly magnetic material early may reduce the load on downstream equipment, while a later stage can provide a cleaner ilmenite product after gangue rejection. The answer depends on mineral associations, magnetic susceptibility, final specifications, and the value of co-products such as zircon and rutile.

A rod mill is not normally central to a free-flowing beach-sand circuit, since overgrinding liberated grains can create slimes. If consolidated material, clayey lumps, or cemented sand requires size reduction, the rod mill charging pattern should be reviewed carefully to prevent unnecessary fines and uneven grinding.

Managing Water, Density, And Sand Handling

Water quality is a major design variable. Salinity, dissolved ions, suspended clay, and recycled-process-water chemistry can change settling behaviour and affect downstream magnetic or electrostatic separation. Testwork should compare fresh, recycled, and representative site water where possible. This is particularly important for operations near the coast or in areas where water supply is constrained.

Western Australian projects may need to design around long distances between a mine site, a processing facility, and a port such as Geraldton or Fremantle. A circuit that requires constant clean water or frequent specialist intervention may be less attractive than a slightly lower-recovery flowsheet with robust recycle and simple maintenance. In South Australia and inland New South Wales, evaporation, bore-water quality, and seasonal access can create similar constraints.

Feed preparation also deserves attention. Screens, trommels, attritioning, pumps, and hydrocyclones must handle shell fragments, roots, oversize debris, and clay balls without unstable flow. Sand storage should limit segregation and prevent the plant from receiving a high-density pulse after a long period of low-density feed.

The spiral area needs reliable density measurement and sampling points. Operators should monitor feed pressure, flow, pulp density, wash-water rate, and product split. These measurements make it easier to distinguish a mineralogical problem from a pump, screen, or control fault.

Interpreting Recovery And Product Value

A successful study does not simply report the highest TiO₂ grade. It identifies the economic balance between heavy-mineral recovery, concentrate quality, water use, power consumption, and downstream separation costs. A slightly lower-grade spiral concentrate may be preferable if it retains more valuable ilmenite and can be upgraded economically by low-intensity magnetic separation.

Mass-balance reconciliation is essential. If the calculated recovery changes substantially when the same data are processed by different methods, the sampling system or assay database needs investigation. Variability tests should show how the circuit responds to coarse feed, elevated slimes, low heavy-mineral content, and changing ilmenite-to-rutile ratios.

Product mineralogy should be tied to the intended market. Titanium feedstock customers may specify TiO₂, iron, chromium, vanadium, moisture, and particle-size limits. A project near Newcastle may have different transport and port considerations from one exporting through Bunbury, so logistics and product handling should be included in the value model rather than treated as separate commercial issues.

Maintenance data should begin during pilot work. Tracking pump failures, blocked spray bars, worn spiral surfaces, screen blinding, and sampling interruptions creates a baseline for the operating phase. A structured set of grinding mill maintenance KPIs is intended for a different equipment duty, but the same principle applies: measurable indicators support better availability and lifecycle decisions.

Translating Testwork Into Plant Design

The final report should convert laboratory observations into a clear process basis. It should define the feed envelope, design capacity, availability, operating hours, water balance, product targets, expected recoveries, equipment duty, and conditions requiring operator intervention. Designers can then size pumps, screens, cyclones, spirals, thickeners, magnetic separators, and stockpiles with appropriate allowances.

Pilot testing is advisable when the deposit is highly variable, the product specification is strict, or the proposed plant will use recycled water. A pilot campaign can expose practical issues such as unstable splitter settings, poor feed distribution, sand packing, and difficulty obtaining representative samples. It also gives operators a chance to develop procedures before commissioning a full-scale facility.

A useful action list for an Australian ilmenite project includes:

The completed study should support more than equipment selection. It should help define an EPC scope, procurement package, commissioning plan, operator training programme, and performance guarantee. For a remote Australian site, early planning for spare parts, technical support, communications, and wet-season access can prevent a small process issue from becoming a prolonged production outage.

A well-structured spiral concentration study gives decision-makers a transparent route from beach-sand geology to a bankable beneficiation circuit. Share representative samples, target products, water data, and production requirements with an experienced mineral-processing team through Lozova.org to develop testwork and plant-design decisions grounded in the conditions of the proposed operation.